Silentium-Logo

Contact Us | 866-611-6044

  • Home
  • About Us
  • Products
    • Reflective Noise Barrier Walls
    • Absorptive Noise Barrier Walls
    • Transparent Noise Barrier Walls
    • Integrated Retaining Walls
    • Structure Mounted Noise Barriers
    • Noise Barrier Enclosures
  • Projects
  • Sectors
    • Residential Development
    • Commercial Sound Walls
    • Industrial Sound Walls
    • Municipal Sound Walls
    • Transportation Sound Walls
    • Mining & Energy Sound Walls
  • Resources
  • News
  • Contact Us

Latest News

Silentium Group Stays “On Track” with Davenport Diamond RER Grade Separation Noise Wall Project
Silentium Group Stays “On Track” with Davenport Diamond RER Grade Separation Noise Wall Project
READ MORE...

Silentium Group Checked all the Boxes for Residential Development Noise Wall Project, St Jacobs ON
Silentium Group Checked all the Boxes for Residential Development Noise Wall Project, St Jacobs ON
READ MORE...

Archive for integrated noise barrier

Silentium Group’s Integrated Mock-up Moves Forward on Davenport Diamond Noise Wall Project

By twelch_6wku8674
Tuesday, September 28th, 2021

Silentium Group’s absorptive noise barrier and integrated architectural cladding system mock-up was reviewed and approved by Metrolinx. Silentium Group’s integrated design checks all the boxes with numerous required components including earth retention, noise reduction and aesthetic continuity.

     

Next steps include full noise wall material procurement with installation commencing in coming months.
Silentium Group is proud to be in partnership with Stubbe’s Precast providing all precast noise wall components on this project.

Categories : Latest News
Tags : absorptive precast, integrated noise barrier, metrolinx project, noise barrier

Silentium Group’s Integrated Retaining Wall / Noise Barrier Wall “Steps Up” for Property Developer

By twelch_6wku8674
Thursday, August 24th, 2017

The Silentium Group teamed up with ParkLane Mechanical Acoustics to provide the Goldman Group with a turn-key noise abatement solution for their residential development project. With over 200 lineal meters of earth retention required,  Silentium Group’s integrated retaining wall / noise wall was the perfect solution for the required application.

A secondary 5 meter high L shaped noise barrier wall was also required and Silentium Group’s absorptive AcoustaCrete noise barrier wall system was also the ideal noise wall system to integrate seamlessly with the earth retention – retaining wall requirement.

Silentium Group’s cantilevered post and panel design was very effective dealing a tight lot line while allowing for minimal excavation and back-fill area. With the noise abatement and earth retention requirements in place, the Goldman Group is continuing to develop the area for a future Mattamy Homes residential development site.

 

 

Categories : Latest News
Tags : absorptive precast, absorptive precast noise wall, absorptive precast noise wall system, AcoustaCrete, civil construction, engineered solutions, integrated noise barrier, noise barrier wall, noise barrier walls, noise wall, noise walls, retaining walls, sound barrier walls, sound wall, sound walls

Silentium Group’s Integrated Retaining Wall / Sound Wall System Selected on Metrolinx Project

By Agatha
Thursday, May 26th, 2016

Silentium Group’s Integrated Retaining Wall / Noise Wall system has been selected on the Metrolinx Stouffville Corridor Track Expansion Project. Due to tight space restrictions on the rail corridor foot print, Silentium Group’s integrated system was the optimal choice where significant grade differences between two sides of the noise wall are present throughout the course of the track .

IMG_5226

IMG_5230

 

 

 

 

 

 

 

Silentium Group’s integrated retaining walls / noise wall designs are engineered in-house and specify the required steel post sections, depth and diameter of footings, along with the panel width necessary to handle typical loads for these type of project requirements.  Installation to commence September 2016.

Categories : Latest News
Tags : civil construction, engineered solutions, integrated noise barrier, integrated noise barrier system, integrated retaining wall, integrated retaining wall / sound wall, metrolinx project, noise wall, noise walls, rail expansion, silentium, silentium group, sound barrier, sound barrier wall, sound wall, sound walls, soundwall, stouffville, Stouffville GO corridor, toronto, turn key noise barrier solutions

Silentium Group’s Integrated Retaining Wall / Noise Wall Chosen for Large Commercial Development Project

By Agatha
Monday, May 9th, 2016

Silentium Group Integrated Noise Wall Retaining WallSilentium Group is pleased to announce that their Integrated Retaining Wall/ Noise Barrier System has been recently chosen for a large commercial/ residential development project adjacent to Warden Ave in Toronto, ON.  The Silentium Group teamed up with ParkLane Mechanical Acoustics to provide the Owner with a requested turn-key noise abatement solutions for this project. Installation to commence July 2016.

 

 

Categories : Latest News
Tags : commercial development, integrated noise barrier, integrated retaining wall, noise abatement, noise abatement solutions, noise barrier wall, noise barrier walls, noise mitigation, noise wall, residential development, silentium group, sound barrier, sound mitigation, sound wall, soundwall, toronto, turn key noise barrier solutions, turn-, warden ave.

The Silentium Group Hits a Home Run by Securing 5 kms of Noise Barrier Wall

By Agatha
Friday, August 28th, 2015

The Silentium Group is pleased to announce that their MTO DSM Eco Sound Barrier System integrated with its ready fit framed noise barrier wall panels were selected as the engineered reflective noise wall solution for the rail expansion project in the Stouffville, Ontario corridor. The Silentium Group’s Eco Sound Barrier System was able to stand out from the competition through various advantages of a lightweight and easy to install design, acoustical performance, combined by the various aesthetically pleasing options available.

The Stouffville 5 kilometer rail expansion will consist of over 16,000 sq. meters of the Silentium Group’s reflective sound wall and is the first part of a multi-year project with future phases to expand and improve 17 kilometers of corridor.  The Silentium Group is excited to have their MTO approved DSM Eco Sound Barrier System supplied in this project as it will not only improve transit, but provide environmentally conscious noise mitigation solutions along with an enhanced aesthetic appearance to residents in the area. Phase 1 construction to commence October 2015 with estimated completion by June 2016.

Categories : Latest News
Tags : civil construction, engineered solutions, integrated noise barrier, integrated noise barrier system, integrated retaining wall, integrated retaining wall / sound wall, metrolinx, noise barrier, noise barrier system, noise barrier wall, noise barrier walls, noise mitigation, noise reduction, noise wall, rail expansion, silentium, silentium group, sound barrier, sound wall, Stouffville GO corridor, turn key noise barrier solutions
Untitled Document
Home | About Us | Products | Projects | Sectors | Resources | Blog | Contact Us
Facebook Google+ LinkedIn YouTube
Copyright © 2015 All Rights Reserved

Silentium Group Inc.
340 Henry St. Suite 15 Upper – Brantford, ON N3S 7R5

Phone: 866-611-6044 | Fax: 866-402-0580
Email: inquiries@silentiumgroupco.com