The Silentium Group teamed up with ParkLane Mechanical Acoustics to provide the Goldman Group with a turn-key noise abatement solution for their residential development project. With over 200 lineal meters of earth retention required, Silentium Group’s integrated retaining wall / noise wall was the perfect solution for the required application.
A secondary 5 meter high L shaped noise barrier wall was also required and Silentium Group’s absorptive AcoustaCrete noise barrier wall system was also the ideal noise wall system to integrate seamlessly with the earth retention – retaining wall requirement.
Silentium Group’s cantilevered post and panel design was very effective dealing a tight lot line while allowing for minimal excavation and back-fill area. With the noise abatement and earth retention requirements in place, the Goldman Group is continuing to develop the area for a future Mattamy Homes residential development site.