The Silentium Group is pleased to announce that their MTO DSM Eco Sound Barrier System integrated with its ready fit framed noise barrier wall panels were selected as the engineered reflective noise wall solution for the rail expansion project in the Stouffville, Ontario corridor. The Silentium Group’s Eco Sound Barrier System was able to stand out from the competition through various advantages of a lightweight and easy to install design, acoustical performance, combined by the various aesthetically pleasing options available.
The Stouffville 5 kilometer rail expansion will consist of over 16,000 sq. meters of the Silentium Group’s reflective sound wall and is the first part of a multi-year project with future phases to expand and improve 17 kilometers of corridor. The Silentium Group is excited to have their MTO approved DSM Eco Sound Barrier System supplied in this project as it will not only improve transit, but provide environmentally conscious noise mitigation solutions along with an enhanced aesthetic appearance to residents in the area. Phase 1 construction to commence October 2015 with estimated completion by June 2016.