The Maintenance and Storage Facility (MSF), located on Belfast Road, is a key feature of the Confederation Line, Ottawa’s Light Rail Transit (LRT) project.
While looking to extend onto an existing noise wall for continuous noise mitigation, OLRT Constructors chose Silentium Group’s MTO DSM Eco Sound Barrier System due its superior noise wall panel spanning capabilities of over 4 meters; along with appeasing local residents with an intricate stone print pattern panel design as shown below.
Silentium Groups noise wall system will be designed to connect to an existing noise barrier and stand tall at 7 meters with a length of over half of a kilometer. Construction of Silentium Group’s Eco Sound Barrier to commence in August of 2017.